Project Portfolio
Projects
Browse our recently completed projects.

Geisinger Cancer Center
- Linear accelerator
- Modular pharmacy
- Steam boiler skid system

Henry Science Center
- Central welded stainless steel lab exhaust system
- 59,000 CFM lab space air handler
- Over 4,500 deck inserts with prefabricated hangers

Behavioral Health Center Northeast
- Central boiler plant
- More than 300 security air devices
- Welded kitchen exhaust systems

Manufacturing Facility Expansion
- Custom fabricated pipe rack system
- Prefabricated pump and heat exchanger skids
- Dust collection system

New Intermediate School
- Central chilled water/hot water systems
- Exposed gymnasium spiral duct
- Packaged RTUs with VAVs

Pascucci Family Health Sciences Pavilion
- Underground central chilled water extension
- Double-wall construction ductwork
- Tiered lecture hall

Occupational Therapy & Physical Therapy Renovation
- Six heat recovery VRV systems
- Central energy recovery DOAS units
- 3D laser scanning with BIM coordination

Dawson Building Renovation
- Two heat recovery VRF systems
- VAV system for outside air
- 3D laser scanning with BIM coordination

Children’s Service Center Addition and Renovation
- Preset cable hangers with total station layout
- 3 floor heat recovery VRF system
- Central energy recovery DOAS units

Geisinger Montage Primary Care Center
- Central boiler system for VAV reheat
- Packaged RTUs with VAVs
- 3D laser scanning with BIM coordination

Smithfield Medical Office Building
- Core & shell and tenant fit-out phases
- RTU curb supported equipment screens
- VAV system with electric reheat

Public Safety Building
- Preassembled ductwork spools
- Mechanical penthouse with DOAS units
- Three heat recovery VRF systems

STS Bus Operations and Maintenance Facility
- Hot water boiler skid system
- Infrared heaters, waste oil, and vehicle exhaust systems in garage areas
- "Buy America" project

Student Success Center Renovation
- Constant volume system with reheat duct coils
- Exposed ductwork in architectural feature ceilings
- 3D laser scanning with BIM coordination

Tri-County Lumber & Truss Plant
- Design-build contract
- Intake, ventilation, circulation, and heating for manufacturing spaces
- Energy recovery system for office areas

Bear Creek Charter School Expansion
- Air-cooled chiller
- 30,000 CFM air handler
- Boiler room expansion

Apartment Complex HVAC Upgrades
- Two 11 story towers with 1189 indoor units and 84 outdoor units
- Design-build contract
- Central control system with tenant billing capability
Contact
Ready to plan your next project?
Talk with our team about scope, schedule, and constructability.
